Bottom priming is done which forces the water to the top of the charge and fills the stemming area.

Some challenges are;

  1. Stemming with drill chippings and aggregate.
  • Water and explosives sludge in the stemming area prevents the stemming material to go down to the top of the explosives to consolidate and contain the energy.
  • A charging stick is then used to tamp the chippings excessively to create stemming that should consolidate from the explosives charge. It;
    - may damage the accessories.
    - will create a sludge plug within the stem area with little or no consolidation.
  • Fly rock, blow out, out of hole detonation, excessive air blast, harmful gasses and underperforming explosives are eminent.
WE_3@2x
THE SOLUTION - WATER EXTRACTOR

The benefits of dewatering the stemming length in a charged hole.

- Ensuring that the stemming length is clear and dry.
- The intended stemming can confidently be applied.
- Chippings (dry drill chippings in ROT lengths) can be used effectively.
- Time-saver: stemming a dry hole is quicker than feeding chippings into the water and/or sludge mixture.
- Eradicate bad practices -tamping only the top of the hole which results in insufficient stemming creating blowouts and fly-rock.
- Any water depth can be removed. It'll remove water in internal deck charged holes by lengthening rope.
- Removing excess emulsion from the hole ensures intended results.
- Better explosives efficiency,
- Using the correct stemming material as intended in a dry hole will guarantee fly-rock & air blast control

USING THE WATER EXTRACTOR TO REMOVE WATER WITHIN THE STEMMING AREA.

This operation serves as a check to ensure that the correct stemming can be applied, and holes are not overcharged.

- Extracting water and excess explosives from the holes is a one-person operation
- The designated person to dewater the holes must follow the pump truck at a safe distance determined via risk assessment. i.e. Sm.
- He drops the extractor into the hole and removes water and emulsion sludge to a pre-determined depth as marked on the extractor's rope.
- He pours the water outside the hole where it cannot return or flow into any other hole.
- If a hole is overcharged, remove the access explosives by pushing the pipe down into the explosive’s column to the required stemming depth with a stick of sufficient length.
- The excess explosives must be poured into the nearest primed hole.
- He repeats the process until he reaches the intended stemming depth in the explosive’s column.
- When the hole is cleared down to the twined depth, it must be left to gas and then stemmed normally.